The reconciled first gold pour was buried in the 20/9/22 ann.
Total gold recovered from two millings 64,700 tonnes = 2671 ozs.
first pour.........20,500 tonnes 592 ozs reconciled = 0.90 g/t
second pour.....44,200 tonnes 2,078 ozs = 1.46 g/t
Total.................64,700 tonnes 2,671 ozs = 1.28 g/t.
Why not mill the outstanding 25kt of ore at different Coolgardie plant.
The reconciled first gold pour was buried in the 20/9/22 ann....
Add to My Watchlist
What is My Watchlist?