NHE 0.00% 6.0¢ noble helium limited

Some sort of timeline required before punters jump in, imo. That...

  1. 9,054 Posts.
    lightbulb Created with Sketch. 555
    Some sort of timeline required before punters jump in, imo.
    That may not occur until after the GM in Jan to approve the last CR and notably Tranche 2.
    Lab results timing obviously not affected by funding approval, but timing of the flow tests and drilling of gas column still unconfirmed, at least to us.
 
watchlist Created with Sketch. Add NHE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.