Some sort of timeline required before punters jump in, imo.
That may not occur until after the GM in Jan to approve the last CR and notably Tranche 2.
Lab results timing obviously not affected by funding approval, but timing of the flow tests and drilling of gas column still unconfirmed, at least to us.
- Forums
- ASX - By Stock
- Congratulatory message from the Ministry of Minerals to Noble Helium
Some sort of timeline required before punters jump in, imo. That...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NHE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $31.30M |
Open | High | Low | Value | Volume |
5.4¢ | 6.0¢ | 5.2¢ | $93.44K | 1.725M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 5.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.0¢ | 56833 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.057 |
1 | 100000 | 0.055 |
2 | 57457 | 0.054 |
1 | 50000 | 0.053 |
3 | 167307 | 0.052 |
Price($) | Vol. | No. |
---|---|---|
0.060 | 56833 | 1 |
0.061 | 10000 | 1 |
0.062 | 75000 | 1 |
0.066 | 10000 | 1 |
0.069 | 100000 | 2 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
NHE (ASX) Chart |