CNX 0.00% 7.4¢ carbon energy limited

connection to turbine engines, page-3

  1. 68 Posts.
    Your right, 2nd hand recip. engines.
    When they go for 300mw , they will need gas turbines.
    With the modern metals they have for turbine bladeing, i don't see any issues, as long as the gas will burn, they will fire up.
 
watchlist Created with Sketch. Add CNX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.