For the last month or so the NBN crowd have been trying to lay...

  1. 6,931 Posts.
    For the last month or so the NBN crowd have been trying to lay cable over a 50 m or so stretch on aa road nearby. There is a creek running under the road between ends. On one end the machine was stuck in one place for well over a week and each day 2 other trucks and a team of mean were there. They then went away. Some 2 weeks later they have come back and are now doing the other side of the creek, again with a team of men and at least 2 other trucks. It looks like there are actually drilling horizontally to meet up with the other side. So that 50 m stretch is costing a motza!
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.