ELE 0.00% 0.5¢ elmore ltd

westcott i think its quite irrelevant talking about costs of...

  1. 3,555 Posts.
    lightbulb Created with Sketch. 583
    westcott i think its quite irrelevant talking about costs of transport to port.
    Firstly trucks are more than 20t capacity, more like 45-50t
    the cost of personal and diesal usage would be one rate.. because it would be a lot of trucks involved for cartage, than the rate would be reduced.. my guess is that the transport industrys given they are compeditive would enter a tenfering process or bid.
    3480 x $70 = 245K

    trucks required would be 70 odd to transport that over a distance of 660K is total of 46,000km. fuel prices @ 90c equivalant AUD thats 41K.
    personal say it takes a whole day @100 per truck driver wage.
    thats 7K

    In total lets say 60K it costs.

    245K - 60k = 185K

    the cost per tonne is $27 at mine site
    so 3480 x 27 = 94K

    lets say they are left with 90K profit for every 3480T

    200,000 / 3480 * 94K = 5.4M

    i think that nsl new about this transport cost and that is why they said that it would cost half of the value or IO when it was $60.

    aint debating on costs when we dont know... all i do know is that nsl are very close to being established as a io miner and producer @ a market cap of 40M which in todays standard is regarded as cheap given IO as a hot commodity, and with nsl looking to bolt on projects makes it even sweeter.

    good luck.

 
watchlist Created with Sketch. Add ELE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.