Construction begins on $5 billion transmission line to open up wind, solar and minerals, page-4

  1. 8,407 Posts.
    lightbulb Created with Sketch. 67
    Bacci,
    With the usual cost blowouts in Queensland this will end up costing $10 billion not $5!
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.