Construction begins on $5 billion transmission line to open up wind, solar and minerals, page-5

  1. 20,062 Posts.
    And to put it into perspective, using those numbers, the 28,000 km of new transmission lines that are needed to hook up all the swindle factories will cost a lazy $167 Billion.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.