And to put it into perspective, using those numbers, the 28,000 km of new transmission lines that are needed to hook up all the swindle factories will cost a lazy $167 Billion.
- Forums
- Political Debate
- Construction begins on $5 billion transmission line to open up wind, solar and minerals
And to put it into perspective, using those numbers, the 28,000...
Featured News
Featured News
The Watchlist
NUZ
NEURIZON THERAPEUTICS LIMITED
Dr Michael Thurn, CEO & MD
Dr Michael Thurn
CEO & MD
SPONSORED BY The Market Online