And to put it into perspective, using those numbers, the 28,000...

  1. 20,062 Posts.
    And to put it into perspective, using those numbers, the 28,000 km of new transmission lines that are needed to hook up all the swindle factories will cost a lazy $167 Billion.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.