M4M 0.00% 3.2¢ macro metals limited

Construction of an Iron Ore Mine and Processing Plant in Nigeria

  1. 2,985 Posts.
    lightbulb Created with Sketch. 1242
    Unfortunately it is not Kogi. Has Kogi missed the boat?

    ANRML are constructing an Iron Ore mine and Processing Plant in Kaduna State. The phase 1 of the processing plant will be completed in about 6 months. ANRML have shown that it can be done, what is holding Kogi Iron back? What's our man in Havana doing?



    “A similarly remarkable investment is the integrated Iron Ore Mining and Processing Plant set up by African Natural Resources and Mines Limited (ANRML) in Kaduna. It has an initial production capacity of 4.704 million tons of iron per annum and will scale up to 5.88 million tons per annum.”

    https://bizwatchnigeria.ng/mining-sector-can-boost-nigerias-revenue-generation-osinbajo/

    https://anrml.com/

    https://www.npowerdg.com/2021/08/anrml-nationwide-massive-recruitment.html

    https://www.jayfm.ng/true-kaduna-iron-ore-mining-company-is-recruiting/

    https://searchngr.com/anrml-nationwide-recruitment-2021/
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
3.2¢
Change
0.000(0.00%)
Mkt cap ! $115.1M
Open High Low Value Volume
3.2¢ 3.2¢ 3.0¢ $78.83K 2.526M

Buyers (Bids)

No. Vol. Price($)
1 50000 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 651529 3
View Market Depth
Last trade - 15.57pm 25/07/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.