hi guysnot exactly what we want to hear..GGX will retest at a...

  1. 37,286 Posts.
    lightbulb Created with Sketch. 401
    hi guys

    not exactly what we want to hear..

    GGX will retest at a later stage when stability is better

    drilling continues, lets hope the next primary objective is better.

    comments welcomed..

    Level 14, 19 -31 Pitt Street
    Sydney NSW 2000
    Tel: +61 2 9252 7210
    Fax: +61 2 9252 7215
    Mobile: + 61 405 677 149
    Email:[email protected]
    Registered office: Level 2, 1 York Street, Sydney NSW 2000, Australia
    A.C.N. 112 138 780
    10th January, 2006
    Update on Drilling Activity -
    Malolos-1 and Nuevo Malolos-1, SC44, Cebu Island, Philippines
    Nuevo Malolos 1 Daily Status Report (Day 14)
    Time of report: 6 am (Philippines = GMT + 8), 10th January 2006
    Current depth: 2,895 ft ( 882 m)
    Current operation: Drilling ahead
    Forward operation: Drill ahead to M 3 objective at 3,300 ft (1,006 m)
    Comment: Cavings continue to create difficulty in a section between 2,730 ft and 2,780
    ft. Current hole conditions are not favourable for a test although peak gas of
    6.77% was encountered at 2,760 ft. We will continued to work with a view to
    straddle test at a later stage when continued conditioning has improved the
    stability. At 6 am the hole was showing already some improvements.
    Background
    Gas2Grid owns 100% of the 100,000 hectare onshore licence SC44 on Cebu Island in the Philippines. The
    licence contains two 1960’s gas discoveries, Malolos-1 and Zaragosa-1. Gas2Grid’s objective is to
    appraise the Malolos feature with a view to establishing a sustainable gas flow. In 1960, the well flowed
    gas from drill stem tests at rates of 5 mmscfd and 12.6 mmscfd from zones at 850m and 1850m
    respectively. If the aggregate flow of 17.6 mmscfd flow could be sustained, it would be sufficient to fire a
    40MW power plant.
    The objective of the current campaign is collect modern reservoir data and establish if the gas flow can be
    sustained and if, at what rates and pressure. A longer term (6 – 8 week) production test is scheduled to be
    carried out following the drilling campaign, should the result of the well be sufficiently encouraging.
    The Malolos feature alone has potential gas resources of 50 bcf. It is on trend with three other culminations
    (Butak, Barili and Esperanza) which have a combined area of closure of 24 sq. km and estimated gas
    resources of 240 bcf based on simple assumptions derived from the Malolos-1 discovery. There are
    another 10 leads in the licence, the most attractive of which have potential gas resources in the order of 150
    bcf. The tax regime in the Philippines is benign and affords returns similar to those achieved in Australia.
    In the 60’s, gas had no commercial value, as gas-fired power generation as it is now used was not yet
    developed. Furthermore, an electricity-hungry market has developed some 30 km north of SC44 where
    Cebu City has 1.5 million inhabitants, and is the 2nd largest city in the Philippines and a significant
    manufacturing centre. Gas2Grid will be appraising the Malolos discovery with the aim to produce gas for
    electricity generation. A deed of agreement has been entered into with Marubeni who would operate any
    power installation.
    Gundi Royle
    Managing Director
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.