VMG 0.00% 0.1¢ vdm group limited

01042 The Construction of Ocean Reef Road Dual Carriageway...

  1. 276 Posts.
    lightbulb Created with Sketch. 38
    01042 The Construction of Ocean Reef Road Dual Carriageway (Stage 2) - Prestige Parade to Alexander Drive, Wangara
    Successful Contractor: VDM Earthmoving Contractors T/as Malavoca
    date of Award: 9 March 2011
    List of Offers from:
    1. Brierty Limited
    2. CECK Pty Ltd
    3. Curnow Group Pty Ltd
    4. Densford Civil Pty Ltd
    5. Downer EDi Works Pty Ltd
    6. Fulton Hogan Construction Pty Ltd
    7. Georgiou Group Pty Ltd
    8. VDM Earthmoving Contractors T/as Malavoca
    9. Watpac Civil & Mining Pty Ltd

    It was in March, so it would be included in the existing work in hand. The thing I like is that vdm beat bids from high quality companies like watpac and downer. The contract was approximately 8 million. I know it is only small, but why doesn't the company announce these wins.
 
watchlist Created with Sketch. Add VMG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.