Surely in any construction --
you wouyld withhold finally payment on ther construction of a house --ie
1/ the roof-- leaked water onto the ceiling
2/ the walls cracking due to poor pad preperation
In my opinion-- gbg feels the contractors constructing the plant ---are responsible for
1/ failure to ramp up on time
2/ faulty works that need to be re-built
3/ I would assume a plant smashing iron-ore 24/7 would have to be built to the highest specifications to survive
------gbg management may have an opinion thet wasnt met ---
in other words the contractors hasnt met their own guarentees 1
- Forums
- ASX - By Stock
- contractors
Surely in any construction --you wouyld withhold finally payment...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online