kkw ..usually 1 deploys 2 rigs for exploitation/dev drilling not exploration or appraisal (unless there's 8-10 wells planned in a shortish timeframe).
Besides, there's a set protocol for the Operator/JV to lodge their annual plans & budget with the locals. So first up u tend to go easy then shoot 3D & then appraise a discovery, followed by a DoC & then exploitation drilling.
U got to keep the locals in the loop too as its their resource & for Senegal its their first offshore project. Wonder if Prez Saul & Mamdou will fly aboard the Athena for their first oil flow. Worth a photo shoot atleast for the entourage.
Hope KOS hits more gas on the Senegalese side of Tortue at Guembuel-1.
- Forums
- ASX - By Stock
- COP Conference call
kkw ..usually 1 deploys 2 rigs for exploitation/dev drilling not...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
47.0¢ |
Change
-0.015(3.09%) |
Mkt cap ! $43.89M |
Open | High | Low | Value | Volume |
47.0¢ | 47.5¢ | 47.0¢ | $9.995K | 21.23K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 82233 | 47.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
48.0¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 82233 | 0.470 |
1 | 50000 | 0.465 |
1 | 50000 | 0.460 |
1 | 3000 | 0.455 |
1 | 1822 | 0.450 |
Price($) | Vol. | No. |
---|---|---|
0.475 | 6918 | 3 |
0.480 | 50000 | 1 |
0.485 | 50000 | 1 |
0.490 | 54000 | 2 |
0.510 | 100895 | 2 |
Last trade - 15.00pm 27/09/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |