    This information highlights BHP's ability to heap leach sulphide copper which is what CYM is planning to do after the Nifty oxides are exhausted. Although BHP is using acid BIO leaching which is different to CYM/Finder Resources Acid Sulphide leaching the outcome and practices are indeed similar. They get copper from Sulphides.
    September 21 2020

    Escondida Copper, Gold and Silver Mine, Atacama Desert

    The Escondida copper-gold-silver mine is located in the arid, northern Atacama Desert of Chile about 160km southeast the

    Producer of ; Copper

    Location ; Northern Chile

    Ownership ; BHP-Billiton (57.5%), Rio Tinto (30%), JECO Corporation (10%), International Finance Corporation (2.5%)

    Geology Type ; Copper porphyry deposit with primary sulphides overlain by secondary oxides

    Annual Copper Production ; 1,185kt of copper in 2020

    Mining Method ; Open pit

    Processing Method ; Sulphide ore – SAG milling and flotation to recover concentrates; Oxide ore – acid leaching and electro-winning to produce copper cathodes

    The Escondida copper-gold-silver mine is located in the arid, northern Atacama Desert of Chile about 160km southeast of the port of Antofagasta, at an elevation of 3,050m above sea level.

    The mine is a joint venture between BHP-Billiton (57.5%), Rio Tinto (30%), a Japanese consortium (10%) and the International Finance Corporation (2.5%).

    It came on-stream in late 1990 and its capacity has since been increased by phased expansions over the years.

    Escondida copper, gold and silver production

    Production at the mine was cut back during the period 2003 on account of the weak world market conditions for copper. The partners in the project decided to mine lower-grade ores while maintaining the concentrator throughput, thus reducing the impact on per-ton-treated costs.

    Output was subsequently ramped up again, and during 2004 the mine handled 377 million tonnes (Mt) of ore and waste and processed 82.4Mt of sulphide ore grading 1.51% copper (up from 70.3Mt at 1.43% copper in 2003).

    The copper production in FY2020 was increased by 4% to 1,185kt, supported by concentrator throughput of 371ktpd. The mine is expected to produce between 940kt and 1,030kt of copper for FY2021, with a 4% decline in copper grade of concentrator feed as a result of reduced workforce due to Covid-19.

    Escondida geology and ore reserves

    Escondida is related geologically to three porphyry bodies intruded along the major Chilean west fissure fault system. Primary hydrothermal sulphide ore grades at between 0.2% and 1% copper.

    Subsequent weathering and uplifting created a barren, leached cap, up to 180m thick, over a high-grade supergene enriched ore, both overlying the primary sulphides. Primary sulphide mineralisation includes pyrite, chalcopyrite and bornite, with covellite and chalcocite in the enriched zone.

    The combined proven and probable ore reserves of Escondida and Escondida Norte as of mid-2004 were: 2,018Mt of copper sulphide ore at 1.24% total copper; 1,701Mt of low-grade copper sulphide ore at 0.55% total copper; and 290Mt of copper oxide ore at 0.73% acid-soluble copper.

    Production and expansions

    1993 and 1994 expansions increased capacity from the initial level of 320,000t/y of copper-in-concentrates to 480,000t/y. Further expansion in 1996 took output capacity to 800,000t/y. In November 1998, concentrator expansion was completed, increasing capacity to 127,000t/d of ore. A new oxide ore processing plant then began operation, reaching its design rate of 125,000t/y of electrolytic copper metal in mid-1999. The $1.044bn 110,000t/d Phase 4 concentrator was completed in September 2002 using retained earnings.

    “Escondida’s proved and probable reserves are currently 3,900Mt, including the addition of 1,200Mt from the Escondida Norte project.”

    The project partners invested $400m in opening the Escondida Norte pit, 5km north of the existing mine. By the end of 2004, 126Mt of material had been moved during pre-stripping operations, and the first production started in 2005. Ore is moved by conveyor to the existing treatment facilities.

    Meanwhile, the Escondida sulphide leach project, designed to produce 180,000t/y of cathode copper cathode, is costing $870m to the commission.The process will use bacterially assisted leaching on low-grade run-of-mine ore from both the Escondida and Escondida Norte pits, with solvent-extraction and electrowinning to produce the copper. Production at the plant began in 2007.

    In 2012, a further investment was announced in two projects at Escondida. The $3.8bn Organic Growth Project 1 (OGP1) was undertaken to replace the Los Colorados concentrator with a new 152,000tpd plant and allow access to higher-grade ore located underneath the existing facilities. Construction began in February 2012 and it was commissioned in May 2015.

    The third copper concentrate plant with a capacity of 152ktpd was inaugurated in 2016. The plant increased the overall copper processing capacity to over 422ktpd. The mine presently includes three concentrator plants, as well as two leaching operations (oxide and sulphide).

    The Escondida Water Supply Expansion (EWSE) project is currently under development, and is expected to deliver its first water in FY2020.

    Escondida open-pit mining

    Escondida is a conventional open-pit operation processing sulphide and oxide ores.

    The mining fleet consists of nine Bucyrus 495-B Erie loading shovels fitted with 50yd³, 53yd³ and 55yd³ buckets, 24 Caterpillar 793B, 28 Komatsu 830-E and 23 Caterpillar 793C dump trucks, each of 218t capacity. Escondida uses eight Bucyrus 49-R and 49-RII electric drills plus an Ingersoll Rand DMM2 diesel drill. Bulk ammonium nitrate-fuel oil (ANFO) explosive is used for blasting.

    Run-of-mine ore is hauled to two semi-mobile, in-pit crushers for a primary reduction before being conveyed to the coarse ore stockpiles. The stripping ratio will average around 1.7:1 over the full life of the project. In-pit truck dispatching and monitoring are handled by a system from Wenco International Mining Systems, while project materials, maintenance and cost control is achieved using Mincom’s mine information management system.

    Ore processing

    Fluor Daniel was awarded the initial contract for designing and constructing the sulphide concentrator, and later for the expansion programmes. The sulphide concentrator employs crushing, milling and flotation circuits. 12m-high, 4m-square column cells are used for cleaning the bulk sulphide concentrate. The concentrator uses 94 Wemco 160m³ cells for rougher and cleaner flotation.

    The separate oxide ore plant uses solvent extraction-electrowinning technology to produce cathode copper metal directly from leached ore. Oxide ore is crushed and sized then heap leached, the dissolved copper being recovered directly by electrolysis.

    Concentrate transport and handling

    Copper concentrates from the Escondida mill are pumped through a 170km-long, nine-inch-diameter pipeline, constructed by PSI-JRI Ingenieria, to the coastal port of Coloso where concentrates are dewatered and dried for export.

    The Canadian company, Sandwell, designed the dock facilities, including a dedicated shiploader.

    Concentrate dewatering employs three Larox style PF and four ceramic hyperbaric filters, which reduce the moisture content to an average of 9% after arrival at the pipeline discharge. Effluent is treated before discharge deep into the Pacific Ocean.

    A Trommel Maintenance Robot was employed in 2018 for changing screens in the trommels.


    The Escondida property currently mines two copper deposits of very similar characteristics, Escondida and Escondida Norte, being mined by open pit mining methods. Escondida is significantly larger than Escondida Norte and the two deposits are separated by less than 10 km

    An important aspect of the deposits is the “supergene enrichment” which has concentrated copper in the upper parts of the mineralised system as a result of natural uplift and weathering processes resulting from the geological evolution of the Atacama Desert region. This process both concentrated copper into certain zones (supergene enrichment), whilst also locally oxidising sulphide minerals to oxide minerals (oxidation) and resulted in the Escondida district presenting both elevated copper grades and a zone nature presenting a range of different copper mineralized zones. This resulting zonation presents a general layered nature with a localised discontinuous “secondary oxide” zone overlying a more continuous enriched or “supergene sulphide” zone which in turn overlies a thicker “hypogene sulphide” zone extending to depth. Pre-mining, the start of copper mineralisation was generally located at approximately 150 to 200 m depth below surface.

    Copper oxide minerals are principally brochantite, antlerite, and chrysocolla along with iron oxides. Supergene zone minerals are dominated by the copper mineral chalcocite with lesser covellite and chalcopyrite occurring with the ubiquitous iron sulphide mineral pyrite. The hypogene sulphide zone is dominated by chalcopyrite and pyrite, with lesser bornite. The hypogene zone copper grades range between 0.2% and 1% copper. The enrichment zone presented copper grade of up to 4% as a result of the supergene enrichment.


    The deposit lies at an altitude of 3,100 m amsl in the eastern foothills of the Atacama Desert and the Domeyko Mountain Range. The area is characterised by its extreme aridity due to a general absence of rainfall, high solar radiation and elevated saline concentration in the soil. These environmental conditions cause an almost total absence of vegetation. The limited vegetation that exists tends to occur in limited areas of water accumulation, temporary surface run-off, and/or the presence of underground water bodies. No permanent surface flows in the area have been identified.
    BHP initiated the sulphide leaching back in 2004.
    https://hotcopper.com.au/data/attachments/5118/5118222-580f1113f90d281e679ff15ff7fc8bba.jpg
 
watchlist Created with Sketch. Add CYM (ASX) to my watchlist
(20min delay)
Last
4.4¢
Change
-0.001(2.22%)
Mkt cap ! $64.03M
Open High Low Value Volume
4.2¢ 4.4¢ 4.2¢ $81.10K 1.863M

Buyers (Bids)

No. Vol. Price($)
4 176000 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 298401 1
View Market Depth
Last trade - 13.18pm 20/06/2024 (20 minute delay) ?
CYM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.