TGS 0.00% 4.9¢ tiger resources limited

Imagine the operation on Kipoi would proceed as planned with the...

  1. 3,775 Posts.
    lightbulb Created with Sketch. 10
    Imagine the operation on Kipoi would proceed as planned with the annual production of 32,500 tons of copper cathodes.
    At the current copper price, a profit margin of at least US $ 1 per pound would be expected.
    That would be about $ 65 million a year.
    You can understand the Lenders when they have patience and support, so that the system is fully functional again.
    The repayment of the loans can be made as a one-time final payment or, if desired, as a partial payment. Interest payments would no longer be a problem at all.
    There would be sufficient resources to build up a functioning cobalt production, generating further substantial revenues.
    Well! All this could already be in progress, had not the adverse construction and / or construction defects led to the present situation.
    Result: Displacement of the o.a. Possibilities through adverse circumstances about 1 year. In my personal opinion.
 
watchlist Created with Sketch. Add TGS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.