NDO 0.00% 85.5¢ nido education limited

correction gindara-1 drilling status

  1. 572 Posts.
    Nido Petroleum Limited (?Nido?, ASX: NDO) on behalf of the SC 54B Joint Venture wishes to correct a statement made in the Memorandum to The Philippine Stock Exchange, Inc. released by the Department of Energy on 23 May 2011.
    Whilst drilling the 17-1/2? hole at 747 metres MD (725 metres TVDss) the drill string became stuck. Following jarring operations the drill string was successfully freed and there was no need to re-spud the well.
    Current drilling operations are continuing to drill the 17-1/2? hole at 774 metres MD (752 metres TVDss). A progress report will be released as scheduled on Thursday, 26 May 2011.
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.