Yes if it wasn't for the Toowoomba bypass the 540 Macintyre Wind Farm blades plus an equal number still to come for stage 2 and a few spares would have never made it over the range.
- Forums
- Economics
- Cost Down, Size up or is it? Wind power size increase
Yes if it wasn't for the Toowoomba bypass the 540 Macintyre Wind...
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online