Cost Down, Size up or is it? Wind power size increase, page-17

  1. 2,650 Posts.
    lightbulb Created with Sketch. 157
    Maybe its different in Qld. The one GW Macintyre wind farm majority owned and operated by Acciona had completed its substation and grid connection more than 18 months ago, The first turbines will start producing power soon although their actual construction was completed over a year ago.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.