Maybe its different in Qld. The one GW Macintyre wind farm majority owned and operated by Acciona had completed its substation and grid connection more than 18 months ago, The first turbines will start producing power soon although their actual construction was completed over a year ago.
- Forums
- Economics
- Cost Down, Size up or is it? Wind power size increase
Maybe its different in Qld. The one GW Macintyre wind farm...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online