Hi All,
I am just researching AEB and believe it has a big future.
I am really keen to find out more on module costings and output but have only been able to make some assumptions per below.
I have some questions and thought I would ask the AEB forum here before approaching the company.
1. EU production facility/Is this likely to be 250 modules, or is this unknown at this stage.
2. If 250 modules this is same as Holcim deal. which states 31mil litres of oil per annum produced from 250 modules. This equates to approx 534BOEPD (IE 31MIL lt/159ltper barrel/365days per yer = 534 barrels/day)
3. If my calcs above are correct this seems very low production for such a huge outlay..IE 100MIL for 250MODULE
I know I am missing something and the above doesn't allow for C02 capture and reuse or biomass resuse but it all just seems out of wack.
Really interested in some views on this to set me straight.
Cheers
RR
- Forums
- ASX - By Stock
- costings v production
Hi All,I am just researching AEB and believe it has a big...
-
-
- There are more pages in this discussion • 132 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online