amazed a couple of people dont seem to read the whole report and understand about establishing operations. mining costs out of control ? read it properly. pre strip and establishing stopes are expensive, ie huge strip ratios ie lots of waste for very little ore but this decreases furthwer down the pit less waste more ore whichs translates to lower costs. they said in the report they would be demobilising mining equipment this quarter. look at the grades mined in september increasing 3 g/t AU in the open cut . things are on track no doubt.
amazed a couple of people dont seem to read the whole report and...
Add to My Watchlist
What is My Watchlist?