Thanks askier, you're a champ.
Looks like there is still some major upside to your calcs.
1. Higher recovery.
2. Maybe a higher revenue with the higher TGC% and if liberation and processing methods improve the base product. Lock should help with that.
3. 15 year project would be the lower bound range of their target in both campoona central and campoona shaft. I am sure there is much more to be found to extend that out.
Looking forward to diamond drill results, maiden JORC, Processing method, BFS and the Most exciting of em all production.
Go you good thing.
- Forums
- ASX - By Stock
- costs to get to production
Thanks askier, you're a champ.Looks like there is still some...
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AXE (ASX) to my watchlist
(20min delay)
|
|||||
Last
41.0¢ |
Change
-0.010(2.38%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
42.5¢ | 42.5¢ | 40.5¢ | $50.52K | 121.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 26999 | 41.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
42.0¢ | 402649 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 24999 | 0.410 |
4 | 27875 | 0.400 |
2 | 27787 | 0.395 |
2 | 32564 | 0.390 |
1 | 7200 | 0.385 |
Price($) | Vol. | No. |
---|---|---|
0.420 | 402649 | 2 |
0.425 | 70000 | 1 |
0.430 | 18987 | 2 |
0.440 | 10000 | 1 |
0.445 | 45100 | 3 |
Last trade - 16.10pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
42.0¢ |
  |
Change
-0.010 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
42.0¢ | 42.5¢ | 40.5¢ | 45523 | ||
Last updated 15.57pm 17/05/2024 ? |
Featured News
AXE (ASX) Chart |