Justinmetals, you mean where PSI81 wrote:
There is no significant retrofitting required, they just need a condenser to strip the ethane out and it's a bolt-on into the existing gas processing stream. It's extremely irresponsible of you to throw around numbers like $300M - that is the cost for a brand new gas processing plant.
Slide 12 of this Honeywell presentation states a capital cost for cryogenic ethane stripper capable of 200 MMscfd is US$20M - these units are modular and pre-fabricated and delivered to site by truck, hardly "significant retrofitting." CTP would only need a maximum of 60 MMscfd. I have no idea how much it would cost in an Australian context but $20M is a more realistic guideline than $150-200M as you are claiming.
----
That's him agreeing with you, is it?
- Forums
- ASX - By Stock
- Cottee's and boards key reason for accepting MB offer no longer valid
Justinmetals, you mean where PSI81 wrote: There is no...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
-0.001(1.96%) |
Mkt cap ! $37.00M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 5.0¢ | $61.41K | 1.222M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 462354 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 450000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 462354 | 0.050 |
2 | 220428 | 0.049 |
2 | 1180647 | 0.048 |
1 | 200000 | 0.047 |
1 | 100000 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.055 | 450000 | 1 |
0.058 | 172431 | 1 |
0.059 | 25000 | 1 |
0.060 | 210909 | 3 |
0.062 | 80000 | 1 |
Last trade - 15.12pm 30/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online