Coal Seam Gas (CSG)
Plans will be put into place to drill coal core-holes to measure the gas
content in pursuit of Coal Seam Gas.
Based on reports submitted to PIRSA by previous coal explorers, there is
an estimate of 32 Billion tonnes of sub-bituminous coal (pre-JORC basis).
This is the basis for a potential of 10-30 Tcf of CSG in place in the
Arckaringa Basin. The coals in this basin have never been tested for gas
content.
It is planned to initially drill 4 core holes in the Arckaringa Basin and 1 (with
3 contingent holes) in PEL 120 located in the St Vincent’s Basin north of
Adelaide.
Coal
Consultants are already conducting a study on the available coal data to
move towards a JORC compliant resource.
SXP
sapex limited
Coal Seam Gas (CSG)Plans will be put into place to drill coal...
Add to My Watchlist
What is My Watchlist?