countdown to production ... tick tock
ok now fellow copper-heads, this is what matters
if AVB stays on track w construction and its path / timeframe to production
which is on track and well advanced
then as from tomorrow, 1 october, we should will be producing w/in 6 months (by end of march 2016)
stay focused and don’t let the little stuff get in the way of the big picture
AVB’s time is approaching … not long now ... good luck all
- Forums
- ASX - By Stock
- AVB
- countdown to production
countdown to production
- There are more pages in this discussion • 148 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVB (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online