One assumes that the 3D seismic results back up the 2PJ estimate as a minimum for the
Leigh Creek Coal Gasification Project - NS Energy (nsenergybusiness.com)
Thus the yet to be agreed to and built plant has a limited life span. Say its $4B now to build and lasts 40 years that's a $100M capital right down to $0 for 1M tonnes per year; so is it really viable is my question. Were we dreaming?.
- Forums
- ASX - By Stock
- Countdown
One assumes that the 3D seismic results back up the 2PJ estimate...
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.73M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online