CPV 2.38% 43.0¢ clearvue technologies limited

CPV, page-1626

  1. 6,435 Posts.
    lightbulb Created with Sketch. 556
    I wonder what criteria the "Australia's Largest Business Lenders" will use to judge ESG plans?

    Some of my thoughts:

    I expect there is an urgent need for all economies to refocus their building & construction to save energy, move towards self-powered buildings i.e.
    1. Solar roof/windows
    2. Battery
    3. Roof/Wall/Floor/Windows- insulation
    4. Energy to be electric
    5. Reduce fossil fuel demand


    All of these appear to be targeted in Australia in a piece-meal approach which is messy & challenging to navigate each!

    There appears too many groups & sub-groups servicing a more sustainable World. Perhaps AI will cut through the Maze (navigate local Govt., State Govt., Federal Govt. regulations) & provide a clearer pathway towards best practice ESG development.

    Will Govt. lead by example and bring their building construction criteria to the forefront? and lead by example?


    I live in a suburb established more than 100 years ago - nearly every street has one OR more new constructions, few appear to taking advantage of North Facing light/warmth? this being the case indicates to me a lack of thermal & energy efficiencies being adopted - to me this is indicative of poor ESG building & construction design & delivery!

    Surely CPV are well placed to ride the wave that the World is starting to drive!?

    - reduce energy consumption
    - drive clean energy generation
    - reduce fossil fuel demand
    - ensure energy efficiency is front & centre in building construction!

    This would best be served both on New & Retro-fitting buildings to meet upgraded ESG needs!


 
watchlist Created with Sketch. Add CPV (ASX) to my watchlist
(20min delay)
Last
43.0¢
Change
0.010(2.38%)
Mkt cap ! $104.6M
Open High Low Value Volume
43.0¢ 43.0¢ 41.5¢ $49.64K 116.5K

Buyers (Bids)

No. Vol. Price($)
2 45560 42.0¢
 

Sellers (Offers)

Price($) Vol. No.
43.0¢ 1881 1
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
CPV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.