1MC 3.03% 3.2¢ morella corporation limited

Not trying to down ramp here by the way. I think AJM need to do...

  1. 1,144 Posts.
    lightbulb Created with Sketch. 23
    Not trying to down ramp here by the way.

    I think AJM need to do another CR. The reason I think this is because of the following

    * PLS stated in the PFS that the cost to produce the DFS was 5.8M (assume similar costs for AJM).
    * Drilling I estimate will be between 1-2M depending on how much they want to drill (starts this quarter ).
    * PLS spent 6M to raise the 100M (assume similar costs for AJM).
    * Ongoing costs (approx 500k-1M between now and plant construction).

    They have 14.3M placement shares left before they exceed the 15%. the 14.3M shares would only raise approx $3M. noted that they received $3M from the Chinese recently but will that be enough?

    When is the next financial report due?
 
watchlist Created with Sketch. Add 1MC (ASX) to my watchlist
(20min delay)
Last
3.2¢
Change
-0.001(3.03%)
Mkt cap ! $8.664M
Open High Low Value Volume
3.3¢ 3.3¢ 3.2¢ $1.554K 48.50K

Buyers (Bids)

No. Vol. Price($)
1 13870 3.2¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 370690 1
View Market Depth
Last trade - 15.52pm 11/09/2024 (20 minute delay) ?
1MC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.