To be fair, it's gonna be the same for any major project - Snowy II, any new Coal fired stations will all be over budget and over time. Probably the same with big renewable projects.
Germany can replace a vehicular bridge over a railway line in three days.
In Australia - 3 months or more no doubt...
- Forums
- Political Debate
- CSIRO at last telling the Truth
To be fair, it's gonna be the same for any major project - Snowy...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)