Its too hard to tell given the limited information provided in the last update of Feb 14th which indicated well at 2397mMD, this equated to average progress of around 45m per day since the asx update of Feb 1. This is a lot slower than the previous drill and no reasons have been given and I can only assume that they were not drilling for all those13 days, whether it was problems with equipment, materials or pressure, etc.
The next target was 2,834MD, which according to their schedule should have been reached by the 10th Feb. If still drilling at 45m per day would now be around 2,670MD. Would need to have increased to 72m per day to get to the next target.
- Forums
- ASX - By Stock
- MAY
- Cuba Block 9: Alameda-3 Drilling Update 14 February 2024
Cuba Block 9: Alameda-3 Drilling Update 14 February 2024, page-85
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
-0.002(10.0%) |
Mkt cap ! $60.66M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.8¢ | $131.2K | 6.839M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 859175 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.9¢ | 250000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 859175 | 0.018 |
5 | 709055 | 0.017 |
2 | 700000 | 0.016 |
2 | 714015 | 0.014 |
1 | 200100 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.019 | 250000 | 1 |
0.020 | 79262 | 1 |
0.021 | 638770 | 6 |
0.022 | 562956 | 5 |
0.023 | 4322076 | 8 |
Last trade - 16.10pm 09/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |