News AlertCuba Block: 9 Alameda-3 Drilling UpdateHighlightsSection Total Depth (TD) called at 2860mMD in seal above Alameda reservoir.Currently preparing to undertake wireline logging in open hole.Once logging is complete 9-5/8” casing will be cemented into hole section.Testing of 10,000 psi Blow Out Preventer (BOP) will be performed prior to 8” drilling.After setting and testing casing, plan is to drill ahead through Alameda reservoir to next casing point in seal above the Marti reservoir (~3586mMD).
A new article has been posted to our website.
- Forums
- ASX - By Stock
- Cuba Block 9: Alameda-3 Drilling Update 22 February 202
News AlertCuba Block: 9 Alameda-3 Drilling...
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
-0.001(1.43%) |
Mkt cap ! $232.5M |
Open | High | Low | Value | Volume |
7.0¢ | 7.0¢ | 6.8¢ | $275.1K | 3.983M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 289170 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 560000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 289170 | 0.069 |
4 | 347699 | 0.068 |
4 | 439500 | 0.067 |
6 | 1907659 | 0.066 |
5 | 534969 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 260000 | 1 |
0.071 | 548695 | 3 |
0.072 | 294100 | 2 |
0.073 | 244538 | 6 |
0.074 | 250000 | 1 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
6.9¢ |
  |
Change
-0.001 ( 1.85 %) |
|||
Open | High | Low | Volume | ||
7.0¢ | 7.0¢ | 6.8¢ | 2492935 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
MAY (ASX) Chart |