MAY 4.29% 7.3¢ melbana energy limited

Cuba Block 9: Alameda-3 Drilling Update 22 February 202, page-103

  1. 5,717 Posts.
    lightbulb Created with Sketch. 1056
    News AlertCuba Block: 9 Alameda-3 Drilling UpdateHighlightsSection Total Depth (TD) called at 2860mMD in seal above Alameda reservoir.Currently preparing to undertake wireline logging in open hole.Once logging is complete 9-5/8” casing will be cemented into hole section.Testing of 10,000 psi Blow Out Preventer (BOP) will be performed prior to 8” drilling.After setting and testing casing, plan is to drill ahead through Alameda reservoir to next casing point in seal above the Marti reservoir (~3586mMD).
    A new article has been posted to our website.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
0.003(4.29%)
Mkt cap ! $246.0M
Open High Low Value Volume
7.1¢ 7.4¢ 7.1¢ $839.0K 11.62M

Buyers (Bids)

No. Vol. Price($)
2 455467 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 705500 5
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
7.4¢
  Change
0.003 ( 6.02 %)
Open High Low Volume
7.1¢ 7.4¢ 7.0¢ 3963620
Last updated 15.59pm 07/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.