MAY 3.70% 2.6¢ melbana energy limited

Cuba Block 9 Operations Update, 12 March, page-220

  1. 3,626 Posts.
    lightbulb Created with Sketch. 1134
    Being a high pressure separator I figured it was not an off the shelf product. However if it wasn’t and has caused that delay it’s only a point of interest now as the water under the bridge is flowing. When things like inexplicable delays occur I like to seek an explanation, even if belated. I prefer a world that is logical but I am not obsessed with looking into details, I’m happy to make assumptions as long as they are logical. Anyway delays aren’t recoverable so it’s a non issue except for the curious of mind.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
-0.001(3.70%)
Mkt cap ! $87.62M
Open High Low Value Volume
2.7¢ 2.7¢ 2.6¢ $40.62K 1.529M

Buyers (Bids)

No. Vol. Price($)
1 318747 2.6¢
 

Sellers (Offers)

Price($) Vol. No.
2.8¢ 15000 1
View Market Depth
Last trade - 16.10pm 17/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.