MAY 0.00% 2.8¢ melbana energy limited

Looking back, they drilled to TD at 3,900 meters, attempted a...

  1. 1,826 Posts.
    lightbulb Created with Sketch. 762
    Looking back, they drilled to TD at 3,900 meters, attempted a slotted liner test, but due to well control, had to plug back and do a sidetrack, which was plugged and all over red rover both for Alameda-1 and the SP after they couldn't do any tests (due to the well design). AP has somewhat convinced via webinar they will execute successfully this time round but the market is in wait and see mode...
    Last edited by Deus_EX_102: 12/03/24
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.8¢
Change
0.000(0.00%)
Mkt cap ! $94.36M
Open High Low Value Volume
2.9¢ 2.9¢ 2.8¢ $21.67K 747.9K

Buyers (Bids)

No. Vol. Price($)
13 1199830 2.8¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 364571 3
View Market Depth
Last trade - 10.23am 13/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.