MAY 0.00% 2.1¢ melbana energy limited

Everything makes sense now. 1) No separator on site for...

  1. 6,501 Posts.
    lightbulb Created with Sketch. 2460
    Everything makes sense now.

    1) No separator on site for Alameda/Marti.
    2) Was the reason for no ASX announcements/promotion/webinars that they didn't want to then announce the separator was not ready? hence, killing momentum?
    3) Was drilling intentionally slowed/stopped to account for the separator delay? (to preserve the hole from degradation over time of the most prospective sections?).

    The only positive I get out of all of this is the engineers presumably know they needed a higher pressure, higher volume separator compared to whatever they used for Amistad (that is quite bullish). The mathematics/engineering requirements don't lie.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.000(0.00%)
Mkt cap ! $70.77M
Open High Low Value Volume
2.1¢ 2.3¢ 2.1¢ $91.04K 4.108M

Buyers (Bids)

No. Vol. Price($)
15 2121433 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1168000 4
View Market Depth
Last trade - 16.10pm 15/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.