Everything makes sense now.
1) No separator on site for Alameda/Marti.
2) Was the reason for no ASX announcements/promotion/webinars that they didn't want to then announce the separator was not ready? hence, killing momentum?
3) Was drilling intentionally slowed/stopped to account for the separator delay? (to preserve the hole from degradation over time of the most prospective sections?).
The only positive I get out of all of this is the engineers presumably know they needed a higher pressure, higher volume separator compared to whatever they used for Amistad (that is quite bullish). The mathematics/engineering requirements don't lie.
- Forums
- ASX - By Stock
- Cuba Block 9 Operations Update, 12 March
Everything makes sense now. 1) No separator on site for...
-
- There are more pages in this discussion • 221 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $104.4M |
Open | High | Low | Value | Volume |
3.2¢ | 3.2¢ | 3.0¢ | $37.40K | 1.206M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 416665 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 719197 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 416665 | 0.030 |
9 | 783228 | 0.029 |
13 | 4582058 | 0.028 |
5 | 753740 | 0.027 |
5 | 1187999 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 719197 | 7 |
0.033 | 478000 | 5 |
0.034 | 1275000 | 4 |
0.035 | 1140000 | 2 |
0.036 | 333750 | 2 |
Last trade - 16.10pm 28/10/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |