MAY 4.35% 2.2¢ melbana energy limited

Cuba Block 9 Operations Update, 12 March, page-87

  1. 1,826 Posts.
    lightbulb Created with Sketch. 762
    Hi Feral, the 500mMD gross interval is just in the Alameda 'N' Sheet. There is further logged pay in the Marti structure deeper still...

    From ASX 1 Feb 2022;

    " Ideally, this would have involved each of the three objectives being intersected at the top of their structures. However, designing a well plan involves compromise, and thus, based on the geological mapping, the N structure would have to be intersected at a less than optimal location, being "down dip" from the top of the structure. The potential upside in this scenario, however, is that finding even a thin oil column in the N objective at the current location could indicate a significant resource "updip" of the wellbore."

    The N structure goes off seismic to the east and west and is further mapped by old dynamite lines to the south; the resource could be significant. Lets hope it flows like the clappers



    https://hotcopper.com.au/data/attachments/6027/6027860-d5c10a5f435b8432accf0110ea08f8db.jpg

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.4¢ 2.4¢ 2.1¢ $444.7K 19.98M

Buyers (Bids)

No. Vol. Price($)
3 2048367 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1402823 5
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.