MAY 4.29% 7.3¢ melbana energy limited

Cuba Block 9 Operations Update, 12 March, page-13

  1. 1,812 Posts.
    lightbulb Created with Sketch. 749
    We've got a rough idea from Alameda-1, roughly 10 days to next casing point. As for well TD, I hope they can set a slotted liner this time round and test.

    27 Jan 2022 - Alameda-1 Drilling Update - Oil Shows (2,971 mMD) https://www.melbana.com/site/cpfile/ad1f6db6-80cb-4b57-92f6-e713f8471dc9/Alameda1-Drilling-Update-Oil-Shows.pdf

    1 Feb 2022 - Drilling Update at Alameda-1 - Strong Oil Shows (3,200 mMD) https://www.melbana.com/site/cpfile/89d522cc-63fd-435c-ae3b-7927057f1a20/20220201_ASX_DrillingUpdateAlameda1_StrongOilShows_Final.pd

    7 Feb 2022 - Drilling Update at Alameda-1 - Significant Oil Interval (3,590 mMD) https://www.melbana.com/site/cpfile/a704d6e7-c196-4eff-9f08-b2a81342bc96/Drilling-update-at-Alameda1-Significant-Oil-Interval.pdf
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
7.3¢
Change
0.003(4.29%)
Mkt cap ! $246.0M
Open High Low Value Volume
7.1¢ 7.4¢ 7.1¢ $839.0K 11.62M

Buyers (Bids)

No. Vol. Price($)
2 455467 7.3¢
 

Sellers (Offers)

Price($) Vol. No.
7.4¢ 625000 3
View Market Depth
Last trade - 16.10pm 10/06/2024 (20 minute delay) ?
Last
7.4¢
  Change
0.003 ( 6.02 %)
Open High Low Volume
7.1¢ 7.4¢ 7.0¢ 3963620
Last updated 15.59pm 10/06/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.