Financing for the pipeline is hardly an issue. It will have a payback of less than 12 months. Anyway, we will know soon and all I can say is 12000 psi is a lot of pressure and can easily overcome 20L/s up a 4” production tube (for 10k bpd). Provided the oil flows gently into the slotted liner over a large net interval huge flow rates should be possible for sustained periods without clogging it up with carbonate fines. We’ll know soon enough. I’m just guessing here.
Regarding the pipe, I mean for example I have been screaming for a Perth basin to Moomba pipeline for years. 5B bucks well spent if you ask me for sensational piece of nation building infrastructure. Half a day of lockdown would cost the nation as much….
Another observation for the energy conscious, Just the other day driving from VIC to SA I saw over 50 huge windmills and not one of them was spinning. You could light a fart and it would have produced more power. Renewables are not the solution merely a small component.
- Forums
- ASX - By Stock
- MAY
- Cuba Block 9: Operations Update 31 May 2024
Cuba Block 9: Operations Update 31 May 2024, page-429
-
-
- There are more pages in this discussion • 381 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
|
|||||
Last
2.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $67.40M |
Open | High | Low | Value | Volume |
2.0¢ | 2.1¢ | 2.0¢ | $37.57K | 1.856M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
37 | 11509043 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 1523856 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
33 | 11229043 | 0.020 |
9 | 1025920 | 0.019 |
3 | 358730 | 0.018 |
3 | 80355 | 0.017 |
3 | 1725000 | 0.016 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 1523856 | 5 |
0.022 | 2516137 | 8 |
0.023 | 3200000 | 5 |
0.024 | 2472742 | 6 |
0.025 | 1266441 | 5 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |