MAY 4.76% 2.2¢ melbana energy limited

Cuba Block 9: Operations Update 31 May 2024, page-44

  1. 7,740 Posts.
    lightbulb Created with Sketch. 965
    Put simply - they lost control of the well. TD was 3916 mMD, but there was a "significant and highly pressured influx of oil and gas into the well bore at that depth" (ref: ASX announcement of 13th April 2022). The cement plug (250m) could not control it, so they ended up setting a liner below the shoe of the lower section and cementing it in place. In other words, a rather definitive P&A.

    Learning from this - There is oil in Marti. And it is highly pressured (hence the BOP upgrade).

    Kit
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
0.001(4.76%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.1¢ 2.3¢ 2.1¢ $80.9K 3.638M

Buyers (Bids)

No. Vol. Price($)
14 1993208 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 120000 2
View Market Depth
Last trade - 13.39pm 15/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.