MAY 4.76% 2.2¢ melbana energy limited

Cuba Block 9: Operations Update 31 May 2024, page-45

  1. 3,480 Posts.
    lightbulb Created with Sketch. 497
    Release Date: 13/04/22 10:49 Summary: Alameda-1 Drilling Update Price Sensitive: Yes Download Document 166.34KB
    https://hotcopper.com.au/threads/ann-alameda-1-drilling-update.6693308/

    Alameda-1 Drilling UpdateHighlights- Oil continued to flow into the well bore in the Marti structure, interrupting plans toconduct short form tests in this highly pressured oil interval- Marti structure clearly has moveable oil in a highly energised environment and thereforewarrants a longer and more comprehensive testing program than can be delivered by theshort form test contemplated by the side track approach- Forward work plan is to isolate the Marti structure then conduct tests in the (immediatelyhigher) Alameda structure. The drilling rig will then relocate and commence drillingZapato-1, the second well in this exploration program- Planning for a more thorough test of the Marti structure will proceed with existingpreparations for a possible appraisal well into the Amistad (shallowest) structure atAlameda-1 following the completion of Zapato-1
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
0.001(4.76%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.1¢ 2.2¢ 2.1¢ $37.31K 1.715M

Buyers (Bids)

No. Vol. Price($)
3 137391 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 1313229 5
View Market Depth
Last trade - 11.45am 15/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.