MAY 4.35% 2.2¢ melbana energy limited

Cuba Block 9: Operations Update 9 April 2024, page-3

  1. 404 Posts.
    lightbulb Created with Sketch. 71
    Forward plan is to run into hole with Bottom Hole Assembly and drill 8 ½” hole to section Total Depth prognosed at 3586 mMD.

    Can we assume that the TD quoted is only for the Alameda section and that they will continue to drill the next 300m into the Marti section as originally planned.

 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $74.14M
Open High Low Value Volume
2.3¢ 2.4¢ 2.2¢ $40.21K 1.760M

Buyers (Bids)

No. Vol. Price($)
18 5561359 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 3575852 17
View Market Depth
Last trade - 16.10pm 30/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.