Forward plan is to run into hole with Bottom Hole Assembly and drill 8 ½” hole to section Total Depth prognosed at 3586 mMD.
Can we assume that the TD quoted is only for the Alameda section and that they will continue to drill the next 300m into the Marti section as originally planned.
- Forums
- ASX - By Stock
- MAY
- Cuba Block 9: Operations Update 9 April 2024
Cuba Block 9: Operations Update 9 April 2024, page-3
-
- There are more pages in this discussion • 148 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $74.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 100225 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 100225 | 0.022 |
3 | 590000 | 0.021 |
13 | 1996573 | 0.020 |
7 | 1251660 | 0.019 |
2 | 483750 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 100000 | 1 |
0.022 | 146165 | 2 |
0.023 | 3364770 | 7 |
0.024 | 3291429 | 13 |
0.025 | 2498709 | 12 |
Last trade - 08.51am 06/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
Day chart unavailable