MAY 4.35% 2.2¢ melbana energy limited

Cuba Block 9: Operations Update 9 April 2024, page-48

  1. 340 Posts.
    lightbulb Created with Sketch. 171
    The drilling team is doing great. Management promised better communication after poor communication then comes out with worse communication? In a technically difficult drill communication must be the easiest part right? Some people have hundreds of thousands on these forums in May yet we arnt even given an explanation as to why such a lengthy delay or why the 2 cores? Or no asx updates which have resulted in a poor current share price?
    To say management are doing good is very misguided.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.