The way i read this presentation, Block 9 Cuba is hinging on the result of Block 10 Sherritt (this was always my thoughts -the delays we are having go right back to the start of the year when drilling went pair shaped for Sherritt. In my opinion who ever the farm -in will sign letter of intent once Sherritt release results. In my opinion Cuba is now running now 10 - 12 months behind schedule. It's going to be very interseting in how MAY now structures the cash raise. Just my debateable opinion. DYOR
- Forums
- ASX - By Stock
- Cuba hinges on Sherritt's Results
The way i read this presentation, Block 9 Cuba is hinging on the...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.7¢ |
Change
-0.001(3.57%) |
Mkt cap ! $94.36M |
Open | High | Low | Value | Volume |
2.9¢ | 2.9¢ | 2.7¢ | $87.74K | 3.087M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 848777 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 284679 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 848777 | 0.027 |
4 | 228014 | 0.026 |
8 | 3469000 | 0.025 |
7 | 2024166 | 0.024 |
8 | 1123578 | 0.023 |
Price($) | Vol. | No. |
---|---|---|
0.029 | 284679 | 3 |
0.030 | 1005727 | 5 |
0.031 | 3050687 | 4 |
0.032 | 1727605 | 7 |
0.033 | 1466600 | 4 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online