MAY 3.57% 2.7¢ melbana energy limited

The way i read this presentation, Block 9 Cuba is hinging on the...

  1. 338 Posts.
    lightbulb Created with Sketch. 143
    The way i read this presentation, Block 9 Cuba is hinging on the result of Block 10 Sherritt (this was always my thoughts -the delays we are having go right back to the start of the year when drilling went pair shaped for Sherritt. In my opinion who ever the farm -in will sign letter of intent once Sherritt release results. In my opinion Cuba is now running now 10 - 12 months behind schedule. It's going to be very interseting in how MAY now structures the cash raise. Just my debateable opinion. DYOR
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.7¢
Change
-0.001(3.57%)
Mkt cap ! $94.36M
Open High Low Value Volume
2.9¢ 2.9¢ 2.7¢ $87.74K 3.087M

Buyers (Bids)

No. Vol. Price($)
5 848777 2.7¢
 

Sellers (Offers)

Price($) Vol. No.
2.9¢ 284679 3
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.