Hi there,
A couple of people asked a while back whether anyone knew of the location of the current Andewa drill holes...
I talked to PM at the Sydney presentation (20:20 Investor Series) on Fri 15 June. He said the program would consist initially (starting Sat 16 June) of 5 x 1,000m holes, starting at 60 degrees inclination, under pad #1 (ie. the pad where hole ADH001 was drilled from). I think he said they would each be drilled 100m apart, and would be located along the line of the 3D-IP survey and soil grid lines (ie. roughly in a NNW to SSE direction). He said that NCM would be doing fences of holes throughout the program, as that is what they normally like to do. Their philosophy is to drill 1,000m holes (on fences) to get vectors to mineralisation...
Hope that helps !
Rgds, W.
- Forums
- ASX - By Stock
- current andewa ncm/fnt jv drilling program
Hi there,A couple of people asked a while back whether anyone...
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LNR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.330M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $451 | 150.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 10581978 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 21445223 | 27 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 10581978 | 0.003 |
51 | 58644228 | 0.002 |
19 | 95890000 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 21038210 | 26 |
0.005 | 10435725 | 13 |
0.006 | 18111224 | 15 |
0.007 | 8151463 | 13 |
0.008 | 25970000 | 9 |
Last trade - 15.34pm 04/10/2024 (20 minute delay) ? |
Featured News
LNR (ASX) Chart |