When completed, the upgraded facility will have the capacity to handle 2,000 barrels of fluid per day
and the water handling capacity will be increased to enable disposal of formation water when it
eventually arrives as it does with almost all oil fields.
The maximum water handling capacity after the upgrade will be 800 barrels per day. However, this
capacity can be increased significantly with little additional capital cost. In the meantime, once the
upgrade is completed, Growler-1 and Growler-2 will be returned to production and the overall
production will initially be increased to around 1500 BOPD.
Depending on the results of the Mollichuta 3D seismic program, which is currently undergoing
When completed, the upgraded facility will have the capacity to...
Add to My Watchlist
What is My Watchlist?