Another thing that Tony did clarify with regards to the additional 3-4 holes that we now need to drill at the north of hardstaff to increase this to an indicated resource so that it can be included in a stage 2 was that their advise prior to commencing the pfs was that it was not required, which it turned out was not correct. The backlog in the labs have eased a little bit and results now taking about 8 instead of 12 weeks to complete according to Tony.