http://cleantechnica.com/2015/08/12...GN&utm_term=0_b9b83ee7eb-b7c5065921-331988261
Nearby wind farms will be connected to DolWin beta by AC cables, which will then transfer the generated electricity through a 45 kilometer-long DC sea cable system, and a further 90 kilometer-long land cable to an HVDC onshore station at the grid connection point in Germany’s Dörpen West.
Add to My Watchlist
What is My Watchlist?