I think the nuts point is you can't load ships from a barge in the middle of a cyclone. Been a week or two since the last shipment so the next should be due shortly.
I'm guessing but being a hydro operation, the dams/ponds etc (could be bore) where they are getting their water from could do with a top up. Especially the bore for all farmers and cattle operations.
- Forums
- ASX - By Stock
- Cyclone season starting?
I think the nuts point is you can't load ships from a barge in...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)